Civil drainage, Darling Street, South Yarra
Tier 2 builder
- Scope
- Civil drainage package to a multi-residential development.
Home / What we deliver / Civil drainage
CVL · Civil drainage
Stormwater drainage, strip drains, pits, treatment systems and pump stations for commercial construction. In-ground work is the least forgiving scope on a project — once it’s backfilled, a mistake costs a surface, not a fitting.

The problem
Everything else on a site can be adjusted after the fact. Drainage can’t. Once a line is laid at the wrong fall, or a pit is set to the wrong level, or a trench is backfilled without proper compaction, the correction costs the surface above it and the program around it.
Which is why the expensive parts of a civil package happen before the machine arrives: reading the levels against the survey, locating what’s already down there, and getting the authority approvals and inspection points booked so nothing gets covered before it’s signed off.
WHAT THIS MEANS FOR YOU
In the ground
Underground work is judged on what nobody sees again. These are the stages that decide whether a surface settles in two years’ time.




Scope detail
Which of these apply depends on the project. The proposal states exactly which are in and which are out.
Mains, reticulation and connections to authority and council assets, set out against the civil drawings and confirmed against site levels.
Trench and strip drainage across hardstand, loading areas, ramps and carparks, set to fall and finished flush with the surface.
Pits, grates and inspection openings set to finished surface level, rated for the traffic they’ll actually carry.
Treatment devices, separators and gross pollutant traps installed to the requirements of the planning and civil documentation.
Wet wells, pumps, level controls, alarms and rising mains, commissioned and documented with duty and standby tested independently.
Basement and low-point pump-out systems, sized to the catchment and installed with the alarm path tested to a real recipient.
Service locating, excavation, shoring, backfill and compaction to specification, and surface reinstatement to match existing.
Sequence
DBYD searches lodged, services physically located and marked, and levels surveyed against the civil documentation. Guessing at this stage is what turns a drainage job into a strike and a shutdown.
Before mobilising
Scope confirmed against levels and capacity, engineering coordinated where required, authority approvals lodged and tracked, and access and staging agreed with your site team.
Before works begin
Excavation, bedding, laying, pits and connections, with inspections booked at the right hold points so nothing gets covered before it’s signed off.
To agreed program
Backfill compacted in layers to specification, surfaces reinstated to match, and as-built PDFs issued so the site has a record of what is actually in the ground.
On completion
Questions we get asked
FAQ
Add FAQPage schema markup to this section.
Recent civil work
Tier 2 builder
Community facility, south-east Melbourne
Next step
We’ll check the levels, tell you what’s missing, and come back with a scoped proposal.